How long does it take to close Safeco Field roof?

20 minutes
And for those interested, here is a fun look at the Safeco Field roof closing, which takes 10–20 minutes depending on wind and other weather conditions. #ILoveSafecoField fact of the day: it takes 10-20 minutes to close the retractable roof, depending on wind and other weather conditions.

Does Safeco Field have a roof?

* TYPE: SAFECO FIELD is the first ballpark designed with a retractable roof that will cover but not enclose the park in case of inclement weather, thus preserving the open-air environment. When extended, the roof will act like an umbrella, covering the playing field and seating areas.

How much did it cost to build Safeco Field?

Safeco Field, which is publicly owned, cost $517 million to construct; the Mariners paid for $145 million of that, including $100 million in cost overruns.

Is Safeco Field changing names?

Mariners’ stadium gets new name as T-Mobile Park replaces Safeco Field ahead of 2019 season. As expected, the Seattle Mariners have announced that the former Safeco Field will be rebranded as T-Mobile Park starting with the 2019 MLB season.

Is the Mariners roof retractable?

The ballpark’s one-of-a-kind retractable roof is designed to cover but not enclose the ballpark, thus preserving an open-air environment. The structure covers nearly 9 acres, weighs 22 million pounds, and contains enough steel to build a skyscraper 55 stories tall.

How much is parking at Mariners game?

Parking is available on the day of the game provided that space exists. Day of game parking for cars, when available, is $25-$50. Motorcycle parking is available at a discounted drive-up rate of $12.50-$25 per motorcycle (pre-purchase unavailable).

Do the Seattle Mariners have a retractable roof?

T-Mobile Park is a retractable roof baseball park in Seattle, Washington, United States. Owned and operated by the Washington State Major League Baseball Stadium Public Facilities District, it is the home stadium of the Seattle Mariners of Major League Baseball (MLB) and has a seating capacity of 47,929 for baseball.

What is the Mariners field called?

T-Mobile Park
Seattle Mariners/Arenas/Stadiums

T-Mobile Park is a retractable roof baseball park in Seattle, Washington, United States. Owned and operated by the Washington State Major League Baseball Stadium Public Facilities District, it is the home stadium of the Seattle Mariners of Major League Baseball (MLB) and has a seating capacity of 47,929 for baseball.

Does the Seattle Mariners stadium have a retractable roof?

What Mariners field?

Seattle Mariners/Arenas/Stadiums

Did the Mariners change their name?

T-Mobile Park (known as Safeco Field from 1999 to 2018) has been home to the Seattle Mariners since the first game vs. the San Diego Padres on July 15, 1999….Seattle Mariners Hall of Fame.

Year Year inducted
Bold Member of the Baseball Hall of Fame
Member of the Baseball Hall of Fame as a Mariner

Does centurylink field have a retractable roof?

The lack of a retractable roof made it open to the elements, provided better views, and reduced the total cost of the project. The roof, at 200,000 sq ft (19,000 m2), covers 70% of the seats but leaves the field open. This disconnects the roof from the support pylons so that it can move independently of the structure.

What are the dimensions of Safeco Field in Seattle?

Safeco Field. Seattle, Washington. Tenants: Seattle Mariners (AL) Opened: July 15, 1999 (against the San Diego Padres) Style: Retractable roof. Surface: Grass. Capacity: 46,621 (baseball only); main bowl: 24,399; club level: 4,254; suite level: 936; upper bowl: 16,022; disabled seats: 1,010 (505 companion seats).

Why was Safeco Field moved closer to home plate?

The Mariners moved the fences at Safeco Field closer to home plate prior to the 2013 season “to create an environment that is fair for both hitters and pitchers,” according to General Manager Jack Zduriencik. Safeco Field had been considered one of the most pitcher-friendly ballparks in the majors since it had opened.

When was the first game played at Safeco Field?

Its first game was on Thursday, July 15, immediately after the All-Star break; the Mariners lost 3–2 to the San Diego Padres with 44,607 in attendance. The naming rights were sold to Seattle-based Safeco Insurance in June 1998, who paid $40 million for a 20-year deal.

When did T Mobile take over Safeco Field?

The city of Seattle saw many other closures as well. The ballpark was originally named Safeco Field under a 20-year naming-rights deal with Seattle-based Safeco Insurance. Safeco declined to renew the agreement beyond the 2018 season, and the naming rights were acquired by T-Mobile on December 19, 2018. The name change took effect January 1, 2019.